# Competition Week 2
*Week 9 (3/5 - 3/11)*
## Assembly
### 03/07 Tuesday
Batteries
- Worked on battery leads
- Did battery testing
Port Hueneme Reflection
- Reflected on Port Hueneme strengths and weaknesses
Pit Layout
- Worked on pit layout

*Pit Layout from Port Hueneme Regional*

*Pit Layout Diagram from Port Hueneme*
BOM
- Worked on new Bill of Materials
Packing
- Checked packing
- Edited packing list
### 03/10 Friday
Robot Cart
- Fix broken wheel on robot cart, replace with new one

Proto swerve
- Continue assembling, electrical, etc.

Pit layout
- Design and finalize layout

*New Pit Layout Diagram Draft*
BOM
- Finalize Bill of Materials
Packing
- Created a new packing list for Los Angeles Regional
### 03/11 Saturday
- Worked on “Is Me Too” proto bot
## CAD
### 3/7
Since we finalized our robot design for Is Me, we have started designing a new robot: Is Me Too. As we are approaching worlds, we have also placed our focus on strengthening our strategies.
### 3/10
We started working on our tech binder and technical drawing package.
## Manufacturing
## Programming
This week, we tested our charging auto that goes out of the community and created auto diagrams.

Vision pickup was also tested and tuned to work. Talon tachs and hall effect sensors were tested in order to be mounted on the robot to limit movement.
### Vision Group
We tuned PID for vision following, more specifically, the sequence for scoring gameobjects on the grid.
For auto and teleop, updated the calibration procedure for limelight dashboard and added specific images of contours.